Eaton’s transmission and distribution engineering automation services help utility companies deliver secure, reliable power and real-time response to events. From design and build services for grid modernisation to substation automation and commissioning projects, Eaton enables utilities to deploy smart grid technologies and SCADA solutions that drive efficiency, reliability and productivity while also addressing challenges such as cyber security.  

T&D automation services

Eaton provides a full scope of design and construction management services throughout the project life cycle.

Download Eaton's transmission & distribution engineering services line card

Substation automation

  • Turnkey (EPC) solutions
  • Engineering and design
  • IED/RTAC/RTU
  • Substation integration (EMS/ SCADA/utility communication)
  • Drawing packages
  • Event recorders
  • Testing, startup and commissioning

Protection and control

  • Engineering and design
  • Redundant protection
  • IED/relay (modernize or replace, legacy electromechanical, digital technology)
  • Power circuit breakers (recondition, upgrade or replace)
  • DC control power/batteries
  • CT/PT/CCVT
  • Integration and communication

Distribution automation

  • Technical support for capacitor banks voltage regulators and reclosers
  • Volt-Var optimization
  • Yukon Feeder Automation software
  • GridAdvisor smart sensor
  • VaultGard communications platform

Remote terminal unit turnkey replacement services

Eaton’s turnkey services team can replace legacy remote terminal units with modern, cyber-secure versions that are accessible via remote communication and operation – minimising substation service interruptions and simplifying the overall engineering and design effort.

 

Modernise your system to a smart grid

Eaton can integrate a multitude of electrical systems into a single, concentrated ECM system, providing the visibility and manageability required to better manage uptime, maintenance costs and overall distribution performance.

Explore the benefits of a turnkey provider

Eaton's on-demand webinar explores the benefits of effectively using an EPC services provider to significantly simplify a variety of undertakings. Find out how Eaton solutions and experienced personnel lessen the demands placed on staff and budgets by managing a reconditioning or grid modernisation project from start to finish.

Improve power reliability through small-scale SCADA systems

SCADA systems no longer need to be relegated to control room settings that support large systems with dedicated staff. The basic technology that supports SCADA can now be cost-effectively scaled to smaller systems with as few as just one substation. This white paper describes how smaller utilities may benefit from SCADA functionality, perceived barriers to implementation, typical requirements, technical considerations, and best practices for engaging engineering and construction partners from recent projects.

Let Eaton be your engineering partner

As organisations increasingly expect their personnel to do more with less, it can be especially challenging to keep systems up to date and optimally performing. With Eaton’s embedded engineer services, you gain an in-house expert to supplement your own staff. Engineers can perform a multitude of tasks including drawing creation, field installation, commissioning of devices and project management.

Eaton’s engineering services team

Eaton’s engineering services team is dedicated to understanding your business so we can optimise your power system for safety, reliability and efficiency. As one of the largest and most experienced teams in the industry, we offer a comprehensive portfolio of services and solutions tailored to every stage of a power system’s life cycle. Eaton strives to create a zero-incident culture through the implementation of our safety policy, including division safety managers and layered risk assessments. Our team has experience with electrical power distribution equipment from all leading manufacturers and is on standby, ready to support you 24/7, wherever and whenever you need us.
Specifications

Remote terminal unit (RTU) turnkey replacement services

Sample RTU replacement project flow:

1.      Walk around the site and define the project scope with all appropriate utility teams

a.      Compare existing substation drawings against field equipment and on-site drawings

b.      Take site measurements to ascertain space availability

2.      Provide a detailed project scope document and proposal including:

a.      outage schedule

b.      equipment bill of material

c.      design requirements

d.      installation and commissioning

3.      Work closely with key utility stakeholders to ensure approval of drawings per customer codes and standards

4.      Complete RTU and relay programming per master SCADA standards

5.      Involve all key stakeholders early on and throughout the project, allowing for cost control and outage and on-time delivery of the project

6.      If needed, use experienced subcontractors overseen by Eaton, providing for a single point of contact and smooth project management of all aspects of the project, even if multiple sites are being completed in parallel

7.      Scale up to meet project resource requirements in order to complete multiple projects simultaneously, allowing for critical project timeframes to be met

 

Smart grid

Recloser and capacitor control

Sample smart grid system project flow including implementation of 2-way capacitor bank controls and smart sensors:

1.      Planning and scoping

2.      Resource plan

3.      Documentation plan (policies, procedures and manuals)

4.      Identification of participating and affected departments

5.      Schedule and key milestones

6.      Training plan

7.      Provisioning and installation; in-service activation

8.      Commissioning and start-up 

 

Network protector engineering installation and commissioning services

Sample scope of work:

1.      Project management and execution with a dedicated project manager

2.      Engineering and design of the underground network protector monitoring systems

3.      Installation of a communication assembly enclosure

4.      Installation of conduit and wire

5.      Replace network protective relays with new, modern-type relays

6.      Start-up, commissioning and point-point verification of monitoring system

7.      SCADA programming and integration

8.      System training

 

Protective relay design, install and commissioning support

Sample scope of work for turnkey project:

1.      Install new relay rack with network equipment to trip the generator breakers

2.      Connect voltage and current to each relay for calculating generator power at the station

3.      Wire each relay trip output contact to the breaker trip coils at the station in parallel with existing traditional relay circuits

4.      Connect the breaker failure indication contacts on each relay at the station to the initiation inputs on in the customer’s breaker failure protection scheme

5.      Wire a relay failure output contact and a channel failure output to the existing RTU

6.      Wire relay failure outputs to the input of the parallel relay

7.      Install trip cutout switches at the station (these could be in addition to existing equipment)

8.      Provide end to end testing support for the project

9.      Following completion of parallel operation testing, deactivate the traditional relay rack system

 

SCADA

Sample scope of work:

1.      Provide technical expertise and system integration solution including software, SMPs, Ethernet switches, power supplies/buffers, enclosures and configuration services

2.      Configure and commission the SMP 4/DP gateway and recloser controls

3.      Implement recloser remote control (if requested)

4.      Communication validation for intelligent electronic devices (IEDs)

5.      System testing and verification of performance

6.      Commissioning assistance

7.      Single line diagram

RTU Engineer 500x500

Utility bolsters reliability, communication with Eaton RTU upgrade

Challenge: Aging substation RTUs were instigating numerous service problems for this utility company, coupled with a lack of available parts to service the units.

Solution: A system that is completely equipment agnostic and customized, including Eaton and hardware from a variety of different manufacturers, as specified by the utility; ensuring seamless configuration, commissioning and deployment process.

Results: Increased reliability and significantly improved device communication, facility telemetry and security. Read the full story.

TD Scada

Eaton small-scale SCADA system for Grand Valley Power

Challenge: Create a cost-effective, scalable SCADA system to provide improved system reliability, increased system visibility, improved workforce efficiency and real-time communications with a supplier able to design and provide a turnkey project solution.

Solution: Eaton provided end-to-end project support including system design, equipment specification, installation and commissioning.

Results: A remotely hosted modular, scalable SCADA system capable of meeting all of Grand Valley Power's functional requirements, implemented with minimal capital infrastructure investment and low maintenance overhead. Read the full story.